2018年4月,我作為項目經理參加了某三級醫院以結構化電子病歷為核心的信息系統的建設項目。該項目總投資525萬元,工期半年,項目以軟件為主,主要包括CDR數據集成平臺、醫生電子病歷、護理電子病歷和電子病歷上傳省平臺接口、移動護理和移動醫療。通過該項目的建設醫院大大提高了醫療信息化水平。該項目模塊繁多,涉及科室和人員眾多,系統又與醫院HIS、LIS、PACS等系統有較多的接口和數據交集,為使項目有序實施,項目的范圍管理就顯得尤為重要。我在充分分析了該項目特點的基礎上,結合實踐,在本項目范圍管理過程中通過加強范圍計劃編制、范圍定義、創建WBS、范圍確認及通范圍控制管理,在項目實施過程中有效防止了范圍蔓延,保證了項目的順利完成。項目于2018年10月通過驗收,受到了醫院的好評。

關鍵詞: 結構化電子病歷;信息系統;信息化管理

Abstract

In April 2018, as a project manager, I participated in the construction of an information system with a structured electronic medical record as the core of a tertiary hospital. The total investment of the project is 5.25 million yuan, and the construction period is half a year. The project is mainly software, mainly including CDR data integration platform, doctor electronic medical record, nursing electronic medical record and electronic medical record uploading provincial platform interface, mobile nursing and mobile medical. Through the construction of the project, the hospital has greatly improved the level of medical information. The project has many modules, involving many departments and personnel. The system has more interfaces and data intersections with hospital HIS, LIS, PACS and other systems. In order to implement the project in an orderly manner, the scope management of the project is particularly important. On the basis of fully analyzing the characteristics of the project, combined with practice, in the project scope management process, through the strengthening of scope planning, scope definition, creation of WBS, scope confirmation and scope control management, effectively prevented in the project implementation process. The scope spread and the project was successfully completed. The project passed the acceptance test in October 2018 and was well received by the hospital.

Key words: Structured electronic medical record; information system; information management